Chautauqua Lake Central School District - The 2020 Capital Improvements Projects – Phase 2 consisted multiple projects on Chautauqua Lakes Campus. The first was a new turf football field which included all new drainage and subbase. A large set of stairs was constructed and led to a new track and field events area. The old tennis courts were demoed and new tennis courts with new drainage, subbase and fence was installed. At the playground area, the old playground was removed, the waterline was re-routed, new drainage installed and the area was re-graded for the installation of a new playground. The old front sign was removed and a new paver patio was installed to accommodate the new main sign to the building.