Chautauqua County Jail Expansion
Parking Lot Construction
 
Storm water detention system excavation.
 
Installation of storm chamber system
 
New parking lot paving on top of the storm chamber system.
 
Project Value - $300,000

The project consisted of building two new parking lots. A new detention system was installed to handle the storm water run-off. Lake Shore Paving completed all of the excavation and backfilling of the new drainage system along with the parking lot subbase installation and asphalt paving.

 

Lake Shore Paving
7 Osmer St.
Jamestown, NY 14701
716-664-4400
716-661-3385 - Fax

www.lakeshorepaving.com

 