| Chautauqua - Cattaraugus - Erie | |||
| 2 BOCES LoGuidace and Hewes Centers | |||
![]() |
|||
![]() |
|||
| Project Value - $900,000 | |||
|
This project consisted of removing the existing asphalt from the parking lots, regrading them and repaving them. Lake Shore Paving also demolished existing concrete stairs, sidewalks and loading docks, then regraded and preped those areas for installation of new concrete. A new drainage detention basin was constructed to catch run - off from the parking lots at the LoGuidace Center. |
|||
|